Carpenter / Woodworker

Your partner for cross laminated timber / CLT

Leidorf CLT Partner braun

You need cross laminated timber | CLT for your project?

We are happy to supply and process cross laminated timber for your project.
We can support you from planning to delivery to the construction site.

This goes so far that we already install windows in the wall element at the factory. What has long been common practice in the prefabricated house industry is a novelty in cross laminated timber.

Our experience: we process

90000
m2 CLT per year
  • CLT KURZE LIEFERZEIT

    CLT trade

    We supply cross laminated timber with a very short delivery time of
    all year 4 - 8 weeks
    that is unique!

  • CLT ABbund

    We not only deliver the cross laminated timber quickly - we also process the material with our robot CNC system and completely bind your building project.

  • Planning

    You do not have the capacity to plan the CLT building?
    We are also happy to take over the timber construction production planning of your cross laminated timber project for you.

  • Fire protection claddings

    No experience in timber construction? We would also be happy to take over the planning of your cross laminated timber project for you.

  • Special components

    If you need a steel beam in the construction or other attachments, we are the right partner for you.

  • Delivery to the construction site

    If you need a steel beam in the construction or other attachments, we are the right partner for you.

Advantages of CLT

45% shorter construction time

.... rent earlier

... previous sale .... saves costs on the construction site ... shorter financing times

3% more lettable area

.... by the same

The timber construction has lower wall thicknesses due to the

2/3 less weight

.... This saves costs at

the foundation and dimensioning of the floor slab .... for the lifting tools

7 x fewer truck journeys

For an eight-storey residential building in timber construction

Decidedly fewer transports of building materials are required than with a conventional construction method.

Source: Housing in wood, arguments and built examples, proHolz Austria, September 2018

Leidorf CLT partner - simply register online

Would you like to become a Leidorf CLT partner?
Here you can register simply and easily.

We look forward to hearing from you!

office@leidorf.com
+43 7751 20 505

Single-family house:
Tight in only 3 days

YouTube

By loading the video, you accept YouTube's privacy policy.
Learn more

Load video

Project report:
CLT installation in a factory hall, Upper Austria

CLT Brettsperrholz Indoor Baustelle
YouTube

By loading the video, you accept YouTube's privacy policy.
Learn more

Load video

Project report: Addition to the Karrer joinery, Upper Austria

Extension to the Karrer joinery
in Wildenau, Upper Austria
Fastening the lifting system
2 screws are screwed into the face of the cross laminated timber elements.
Moving the CLT elements with the crane
The two screws are attached to the crane for moving the elements.
The loading order of the elements
is coordinated so that the parts can be moved immediately on the construction site and do not have to be stored temporarily
The screws of the lifting system
are unscrewed again
Screwing the wall elements together
from the outside with the cordless screwdriver
Previous slide
Next slide
YouTube

By loading the video, you accept YouTube's privacy policy.
Learn more

Load video